St John’s Academy, for Vale Academy Trust, will be built alongside the already completed primary school in Grove on the Wellington Gate Development, and will be the first all-through school (Nursery to Year 11) in the local area, teaching around 600 pupils.

6074m2
gross internal floor area
600
pupils

The two-storey building will feature a green roof with photovoltaic panels. The grass playing fields and MUGA will also have extensive SUDs (sustainable draining systems) featuring attenuation, swales and porous parking areas.

As part of its commitment to both education and sustainability, Bouygues UK will deliver a sustainable, low carbon building with a CLT timber structure, and an enhanced quality construction approach through consistency, off-site manufacturing, and the reduction of waste and defects.

The buildings will also be clad in brickwork and timber panelling with feature aluminium framed entrances, with work expected to start in January 2024.

Education

This might interest you

Bouygues UK